Costed Bill of Materials Report

 

Window Details

 

Navigation

 

Overview

 

Fields

 

Report Sample

 

 

How Do I...

 

 

Create a Phantom Bill

E-mail, Fax, or Print a Report as a PDF

Create a Report Setting

Enter Multiple Values Using Separators

Print a Report, Listing, or Form

 

 

 

Related Topics

 

 

 

Navigation

Select Bill of Materials Reports menu > Costed Bill of Materials Report.  

Overview

Use Costed Bill of Materials Report to list the item and extended bill costs for either a selection of bills or specific bill configurations.

You can use the average cost, last cost, or the standard cost to calculate the item and extended bill costs. You can select the bill types and the number of bill levels to include on the report. You can also select to round the amount in the Quantity to Produce column to the next whole unit when using Integer Units of Measure. Yield and scrap percentages are factored into the quantity requirement calculation when printing a selection of bills with yield or specific bills and the Allow Yield and Scrap Percentage Factors check box is selected in the Bill of Materials window. You can enter a selection of bill numbers, bill revisions, and user-defined fields (UDFs) to print. You can include option codes, blow through phantoms, select to print all effective engineering changes or changes made through a specified date. You can also print each bill on a separate page.

If your bills include phantom bill components, you can print the components instead of printing only the phantom bill numbers.

Note Option interaction bills are not printed on this report.

Note The data entered in the grids is saved automatically to the Bill of Materials data files, and is not saved with the report setting.

Fields

 

Page Break

Include Option Bills

Print Current Revision Only

Effective Change Date

Inventory Cost Type